Flooring
Home ] Outside ] The Big Dig! ] The Skeleton ] Skeleton II ] Czapka ] Insulation ] Drywall ] Inside ] [ Flooring ] Bricks ] Cabinetry ] Siding ] Basement ] Feedback ]

Today the work began on the floor starting with the tiling. Our tile is being installed by Amos from A.H. Tile. The front porch was also poured and the backhoes were digging (well, clawing through the frost line) to run electricity & gas to the house. Weeeeeeeeeeeeeeeeeeeee soon we will have working switches & receptacles! Stay tuned... next week our bricks go on the house!

tile02.jpg (53863 bytes) tile04.jpg (48203 bytes) tile05.jpg (59619 bytes)
tile06.jpg (43348 bytes) tile07.jpg (56024 bytes) tile08.jpg (105162 bytes)
tile03.jpg (63621 bytes) tile20.jpg (61900 bytes) tile13.jpg (49548 bytes)
tile15.jpg (62556 bytes) tile17.jpg (51321 bytes) tile22.jpg (65622 bytes)
  1 week to go & the carpet is in!  
tile23.jpg (64183 bytes) rug11.jpg (63716 bytes) rug12.jpg (54667 bytes)
rug14.jpg (56000 bytes) rug15.jpg (47755 bytes) rug01.jpg (62802 bytes)
rug10.jpg (77356 bytes) rug08.jpg (58322 bytes) rug09.jpg (76483 bytes)
rug02.jpg (57823 bytes) rug03.jpg (33548 bytes) rug05.jpg (57357 bytes)
rug07.jpg (79302 bytes)   fixed_DCP_0867.jpg (153969 bytes)

 

Created by Yoda-
Copyright © 2002 www.yodasolutions.com. All rights reserved.
Revised: December 17, 2006 .